Ask Aeroz

Type the question you actually came here with.

EU Deforestation Regulation · cocoa · São Tomé and Príncipe

EUDR cocoa from São Tomé and Príncipe: low risk, simplified due diligence.

Cocoa from São Tomé and Príncipe is low risk under the EU Deforestation Regulation, so EU operators can use simplified due diligence, but they still collect plot geolocation and file a due diligence statement from 30 December 2026.

Yes. Under the EU Deforestation Regulation (EU) 2023/1115, cocoa from São Tomé and Príncipe is low risk: the country is listed in Implementing Regulation (EU) 2025/1093. From 30 December 2026, large and medium EU operators placing its cocoa on the market can use simplified due diligence, but still collect plot geolocation and file a due diligence statement.

Reg. (EU) 2023/1115Reg. (EU) 2025/1093Low riskForest Law 5/2001Article 13
Key facts · reviewed

EUDR cocoa from São Tomé and Príncipe, in three facts.

Implementing Regulation (EU) 2025/1093 · São Tomé and Príncipe listed as low risk · Forest Law 5/2001 bans clear cutting in production forest and requires a Forests Directorate licence · EUDR applies to large and medium operators from 30 Dec 2026 · about 2,800 tonnes of cocoa beans to the EU in 2025.

What the rule requires

What low risk means for cocoa from São Tomé and Príncipe.

Low risk, listed by name

The Annex of Implementing Regulation (EU) 2025/1093 lists São Tomé and Príncipe among the low-risk countries. Only Belarus, North Korea, Myanmar and Russia are high risk.

Simplified due diligence

Under Article 13 of Regulation (EU) 2023/1115, an operator does not have to carry out the risk assessment and risk mitigation of Articles 10 and 11 if it has checked that all the cocoa was produced in low-risk countries, with negligible risk of circumvention or of mixing with other origins. Plot geolocation and the other Article 9 information are still collected, and a due diligence statement is still filed.

The Forest Law

São Tomé and Príncipe's Forest Law, Law No 5/2001, promulgated on 12 September 2001, bans clear cutting or total felling of forests and other forest land under the forest production regime (Article 26), apart from cases of fire or pests where the Forests Directorate judges removal advisable. Logging needs a management plan and a licence from the Forests Directorate (Article 27), and anyone moving logs needs a Forests Directorate transport permit stating origin, destination, species and volume (Article 54).

Volumes at stake

Eurostat Comext shows EU imports of cocoa beans from São Tomé and Príncipe of about 2,800 tonnes worth 21.3 million euros in 2025, against about 3,700 tonnes worth 17.7 million euros in 2024.

The dates

The timeline, as it stands.

Low risk also means fewer checks: authorities check at least 1% of the operators, non-SME downstream operators and non-SME traders sourcing from low-risk countries each year, against 3% for standard-risk origins.

Forest Law promulgated12 Sep 2001
EUDR applies to large and medium operators and traders30 Dec 2026
EUDR applies to micro and small enterprises30 Jun 2027
What to do now

Three moves that de-risk the deadline.

01 · Step

Confirm every origin is São Tomé and Príncipe

Simplified due diligence holds only if all the cocoa in the product comes from low-risk countries. Check each lot's origin, not only the port of loading.

02 · Step

Get plot data for each lot

Ask your exporter or cooperative for the farmer plots behind each lot. Geolocation is needed for every plot, a polygon for plots over 4 hectares.

03 · Step

Keep these lots apart

Cocoa from standard-risk origins in the same lot or blend brings back the full risk assessment. Keep records that show the lots were never mixed.

How Aeroz fits

Keeping origin attached through the blend.

Aeroz binds lot identity at the buying station, links it to registered plot geolocation, and writes every custody step, station to warehouse to container, as EPCIS 2.0 events. When origin stays attached to each lot, showing that low-risk cocoa was never mixed with other origins becomes a record rather than a claim.

FAQ

EUDR cocoa from São Tomé and Príncipe, answered.

What does the EUDR mean for cocoa from São Tomé and Príncipe?

São Tomé and Príncipe is low risk in Implementing Regulation (EU) 2025/1093, so from 30 December 2026 large and medium EU operators can use simplified due diligence under Article 13 when all the cocoa comes from low-risk countries. They still collect plot geolocation and file a due diligence statement.

Is São Tomé and Príncipe low risk under the EUDR?

Yes. São Tomé and Príncipe is listed as low risk in the Annex of Implementing Regulation (EU) 2025/1093. Only Belarus, North Korea, Myanmar and Russia are high risk.

What does the Forest Law of São Tomé and Príncipe say about clearing?

Law No 5/2001 bans clear cutting or total felling of forests under the forest production regime, apart from fire or pest cases judged by the Forests Directorate, and requires a management plan and a Forests Directorate licence for logging. Under the EUDR, cocoa must also come from land not deforested after 31 December 2020.

When does the EUDR apply to cocoa from São Tomé and Príncipe?

From 30 December 2026 for large and medium operators and traders, and from 30 June 2027 for micro and small enterprises.

Is cocoa from São Tomé and Príncipe exempt from the EUDR?

No. Low risk is not an exemption. The cocoa must still be deforestation-free and legally produced, and the operator still files a due diligence statement.

Readiness audit

Know exactly where you stand, in 14 days.

A fixed-fee Aeroz audit maps your products against EUDR due diligence for cocoa sourced from São Tomé and Príncipe and returns a written readiness assessment, a data-mapping review, and a scoped pilot plan with cost and timeline.

Fixed fee: Readiness Report $2,500, Readiness Audit $4,500 14-day written report No commitment to proceed