Ask Aeroz

Type the question you actually came here with.

EU Deforestation Regulation · cocoa · Brazil

EUDR cocoa from Brazil: standard risk, full due diligence.

Cocoa from Brazil is standard risk under the EU Deforestation Regulation, so EU operators run full due diligence on it, with plot geolocation, a risk assessment and a due diligence statement.

Under the EU Deforestation Regulation (EU) 2023/1115, cocoa from Brazil is standard risk, not high risk: Brazil is not listed in Implementing Regulation (EU) 2025/1093. From 30 December 2026, large and medium EU operators placing Brazilian cocoa on the market must run full due diligence and file a due diligence statement. Micro and small operators follow from 30 June 2027.

Reg. (EU) 2023/1115Reg. (EU) 2025/1093Standard riskForest CodeCAR
Key facts · reviewed

EUDR cocoa from Brazil, in three facts.

Implementing Regulation (EU) 2025/1093 · Brazil not listed, so standard risk · EUDR applies to large and medium operators from 30 Dec 2026 · CAR rural registry mandatory under the Forest Code.

What the rule requires

What standard risk means for Brazilian cocoa.

Standard risk, not high risk

Article 1 of Implementing Regulation (EU) 2025/1093 lists low-risk and high-risk countries in its Annex and keeps a standard level for every country not listed. Brazil is not listed, so it is standard risk.

Full due diligence

Simplified due diligence under Article 13 is only for low-risk origins. For Brazilian cocoa the operator collects the Article 9 information, including the geolocation of every plot, assesses the risk under Article 10, mitigates it under Article 11 and files a due diligence statement.

The CAR rural registry

Article 29 of Brazil's Forest Code, Law 12.651 of 2012, created the Rural Environmental Registry (CAR), a national public electronic register that is mandatory for all rural properties. Registration identifies the property with geographic coordinates and locates its native vegetation, Permanent Preservation Areas and Legal Reserve. Article 12 sets the Legal Reserve at 80% of a property in forest areas of the Legal Amazon, 35% in its cerrado and 20% elsewhere in Brazil.

Volumes at stake

Brazil sends the EU very few cocoa beans. Eurostat Comext shows EU imports of cocoa beans from Brazil of about 159 tonnes worth 0.9 million euros in 2025, against 190 tonnes in 2024.

The dates

The timeline, as it stands.

Standard risk also sets how often authorities check: at least 3% of the operators, non-SME downstream operators and non-SME traders sourcing from standard-risk countries each year, against 1% for low-risk origins.

Country benchmarking list in effect26 May 2025
EUDR applies to large and medium operators and traders30 Dec 2026
EUDR applies to micro and small enterprises30 Jun 2027
What to do now

Three moves that de-risk the deadline.

01 · Step

Map every farm behind each lot

List the farms that supply each lot. Geolocation is needed for every plot, a polygon for plots over 4 hectares.

02 · Step

Ask for the CAR record

Ask suppliers for each property's CAR registration and check that the plots in your statement sit inside the registered property.

03 · Step

Keep Brazilian lots apart

Brazilian cocoa mixed with beans from low-risk origins such as Ghana makes the whole blend standard risk.

How Aeroz fits

Farm to port, one record per lot.

Aeroz binds lot identity at the buying station, links it to registered plot geolocation, and writes every custody step, station to warehouse to container, as EPCIS 2.0 events. The due diligence statement is then built from records, not from supplier declarations collected at the end.

FAQ

EUDR cocoa from Brazil, answered.

Is Brazil high risk under the EUDR?

No. Brazil is not listed in the Annex of Implementing Regulation (EU) 2025/1093, so it is standard risk. Only Belarus, North Korea, Myanmar and Russia are high risk.

What does the EUDR require for cocoa from Brazil?

Full due diligence: plot geolocation and the other Article 9 information, a risk assessment, risk mitigation where needed, and a due diligence statement before the cocoa is placed on the EU market or exported.

What is the CAR in Brazil?

The Rural Environmental Registry, created by Article 29 of the Forest Code (Law 12.651 of 2012). It is a national public electronic register, mandatory for all rural properties, that records each property's coordinates, native vegetation, Permanent Preservation Areas and Legal Reserve.

When does the EUDR apply to Brazilian cocoa?

From 30 December 2026 for large and medium operators and traders, and from 30 June 2027 for micro and small enterprises.

Is Brazil treated the same as Ghana?

No. Ghana is listed as low risk in Implementing Regulation (EU) 2025/1093, while Brazil is standard risk.

Readiness audit

Know exactly where you stand, in 14 days.

A fixed-fee Aeroz audit maps your products against EUDR due diligence for cocoa sourced from Brazil and returns a written readiness assessment, a data-mapping review, and a scoped pilot plan with cost and timeline.

Fixed fee: Readiness Report $2,500, Readiness Audit $4,500 14-day written report No commitment to proceed