Ask Aeroz

Type the question you actually came here with.

Malaysia · exports to the EU

EU battery passport for Malaysia: made in Malaysia, passport for the EU.

For Malaysian battery makers, the EU battery passport means that every EV, light-means-of-transport and industrial battery over 2 kWh sold in the EU from 18 February 2027 needs a passport reached by a QR code, with the importer or other EU operator placing it on the market responsible for it.

From 18 February 2027, every EV battery, light-means-of-transport battery and industrial battery over 2 kWh placed on the EU market needs a battery passport under Regulation (EU) 2023/1542, wherever it was made. For a finished battery shipped from Malaysia, the EU importer is normally the operator placing it on the market, and the passport is its legal responsibility. The Malaysian maker can be authorised to manage the data, but that does not move the responsibility. Malaysia's scheduled waste rules for spent batteries are separate and do not stand in for the EU passport.

Article 7718 Feb 2027QR codeEU importerSW 103
Key facts · reviewed

Battery passport for Malaysian exporters, in three facts.

Malaysia to EU · Regulation (EU) 2023/1542, Article 77 · battery passport from 18 February 2027 · QR code on each battery · the EU importer is normally responsible.

What the rule requires

Made in Malaysia, sold under EU rules.

The passport follows the market, not the factory

Regulation (EU) 2023/1542 applies to batteries placed on the EU market, so a battery made in Malaysia needs the same passport as one made in the EU. The Commission's FAQ confirms the requirement applies to imported batteries.

The importer is normally responsible

A finished battery is normally placed on the EU market when it is imported, so responsibility lies with the importer. The importer, not the Malaysian maker, registers the passport.

The maker can run the data

The operator placing the battery on the market can give another party, such as a non-EU manufacturer, written authorisation to keep the passport data accurate and up to date. The responsibility for compliance and for the data stays with the EU operator.

Malaysia's rules are a separate system

Malaysia's Environmental Quality (Scheduled Wastes) Regulations 2005 list waste batteries containing lithium, cadmium and nickel or mercury as scheduled waste SW 103, and waste lead-acid batteries as SW 102. A factory that generates them notifies the Director General of Environmental Quality within 30 days and keeps an inventory. That is a waste duty in Malaysia, not a product passport. The EU passport is reached through a QR code on the battery and follows the EU's data list.

The dates

The timeline, as it stands.

Cells and modules shipped from Malaysia to a plant in the EU are usually components, not finished batteries. The EU company that completes the battery becomes its manufacturer and is responsible for the passport. The passport asks for more than Malaysia's scheduled waste records, including due diligence data from 18 August 2027. The battery carbon footprint declaration joins the passport later, once the Commission adopts the calculation method.

Malaysia: Scheduled Wastes Regulations in force15 Aug 2005
EU battery passport18 Feb 2027
EU battery due diligence18 Aug 2027
What to do now

Three moves that de-risk the deadline.

01 · Step

Name the EU operator for each product

For every battery model you ship to the EU, write down who places it on the market: your EU importer, your EU subsidiary or a customer who completes the battery. That company owns the passport.

02 · Step

Agree the data split in the contract

Decide who builds and hosts the passport, who supplies which data points, and how corrections are made. If the importer authorises you to manage the data, put the scope in writing.

03 · Step

Start from the Commission's data list

Mark which of the passport data points you hold today, which your own suppliers hold, and which do not exist yet. Plan due diligence data now, because it applies from 18 August 2027.

How Aeroz fits

One identity, factory to EU shelf.

Aeroz gives each battery a physical identity tied to its passport record: the QR code the regulation requires, with an NFC tag on the same identity if you want a tap check. Your EU importer can confirm that the battery in front of them is the one the passport describes, and the data can be maintained from Malaysia under the importer's authorisation, with the importer kept in control.

FAQ

Battery passport for Malaysian exporters, answered.

Does the EU battery passport apply to batteries made in Malaysia?

Yes. Batteries made in Malaysia need one when they are placed on the EU market from 18 February 2027, if they are EV batteries, light-means-of-transport batteries or industrial batteries over 2 kWh. The legal duty sits with the operator placing the battery on the EU market, which for a finished imported battery is normally the importer.

Can a Malaysian manufacturer register the battery passport itself?

It can manage the passport data if the EU operator gives it written authorisation. Authorising a non-EU manufacturer to create or update the passport does not make it the EU manufacturer or importer, and the responsibility stays with the operator placing the battery on the EU market.

Do Malaysia's scheduled waste rules count as an EU battery passport?

No. Under Malaysia's Environmental Quality (Scheduled Wastes) Regulations 2005, spent lithium batteries are scheduled waste SW 103, which sets duties for whoever generates the waste in Malaysia. The EU passport is a separate record, reached through a QR code on the battery.

How much battery trade goes from Malaysia to the EU?

Eurostat records 124.5 million euros of EU imports of lithium-ion batteries from Malaysia in 2025, about 3,400 tonnes, down from 166.4 million euros, about 3,350 tonnes, in 2024.

Readiness audit

Know exactly where you stand, in 14 days.

A fixed-fee Aeroz audit maps your products against EU battery passport requirements for batteries made in Malaysia and sold in the EU and returns a written readiness assessment, a data-mapping review, and a scoped pilot plan with cost and timeline.

Fixed fee: Readiness Report $2,500, Readiness Audit $4,500 14-day written report No commitment to proceed